Electrical & automation / QATAR
What we deliver
Control panels
fabrication and installation of distribution panels: MCC panels, PLC panels, VFD panels, ATS and synchronising panels, pump control panels, lighting control panels, and custom OEM panels — built to IEC 61439 with type-tested enclosures, tested and documented before delivery. Includes panel modification and upgrade of existing installations.
APPLICATION GUIDE
Where this fits your project
A control panel should be developed around its connected loads and required operating sequence. Pump sets, motors and process equipment may need different combinations of protection, starters, drives, controllers and operator interfaces.
Details to resolve before work begins
Confirm the installation environment, enclosure arrangement, cable entry and heat dissipation requirements. A panel enquiry should also state labelling, drawings, component preferences and the factory and site testing expected for the project.
Plan the connected systems
Fire alarm installation ↗ Fire-fighting systems ↗ Building management systems (BMS) ↗
Selection & project coordination
The installation is coordinated with site access, adjoining systems and the operating requirements of the facility. Inspection, commissioning and documentation requirements are agreed as part of the project scope.
Questions before you start
What drawings are useful before control-panel fabrication?
A single-line diagram, load schedule, control sequence and I/O list provide the starting point. The approved arrangement and wiring documentation should resolve interfaces before fabrication proceeds.
What information is needed to quote for control panel fabrication?
Please provide single-line drawings, motor and load schedule, enclosure environment, control sequence and i/o list. Include the project location, drawings or equipment schedule, required delivery date and any consultant specification. This helps our team identify the correct scope before pricing.
How is the control panel fabrication scope agreed?
The team reviews the drawings and site conditions, identifies interfaces with other trades, and sets out the deliverables and exclusions in a written quotation. Technical submittals, inspection requirements and handover records are agreed to suit the project.
Discuss your Qatar project
Contact Aamtron’s Doha team with the project location, drawings and required programme. For occupied buildings or operating facilities, include access restrictions and permitted work windows. Product availability, delivery timing and the agreed scope are confirmed with the quotation.