Fabrication and installation of GI, aluminium, stainless-steel and pre-insulated ductwork to SMACNA standards, including spiral and rectangular duct, fire-rated and kitchen-exhaust duct, VCDs, fire dampers, sound attenuators, diffusers and grilles, external duct cladding, and airflow testing and balancing.
APPLICATION GUIDE
Where this fits your project
Ductwork carries supply, return, fresh and exhaust air through a building. Its route must account for airflow requirements as well as structural openings, ceiling depth, noise-sensitive spaces and access to dampers and equipment.
Details to resolve before work begins
Coordinate branches and terminals against the reflected ceiling plan. Material, reinforcement, sealing, insulation, flexible connections and access panels should follow the agreed specification; balancing and testing requirements should be included in the installation scope.
Selection & project coordination
The installation is coordinated with site access, adjoining systems and the operating requirements of the facility. Inspection, commissioning and documentation requirements are agreed as part of the project scope.
Questions before you start
Why is access important in a ductwork quotation?
Filters, dampers, coils and cleaning points must remain reachable after ceilings and finishes are complete. Identifying access requirements early reduces the risk of reopening completed interiors during maintenance.
What information is needed to quote for ductwork fabrication & installation?
Please provide duct layouts and dimensions, required airflow, material and insulation specification, fire and acoustic requirements. Include the project location, drawings or equipment schedule, required delivery date and any consultant specification. This helps our team identify the correct scope before pricing.
How is the ductwork fabrication & installation scope agreed?
The team reviews the drawings and site conditions, identifies interfaces with other trades, and sets out the deliverables and exclusions in a written quotation. Technical submittals, inspection requirements and handover records are agreed to suit the project.