Aamtron Group was commissioned to design and install a state-of-the-art HVAC system for a pretigious 50-story commercial tower in the heart of West Bay, Doha. The project aimed to achieve maximum energy efficiency while ensuring optimal comfort for occupants in a challenging desert climate.
Our team managed the entire lifecycle of the project, from the supply of high-capacity chillers to the fabrication and installation of extensive ductwork. We integrated a smart Building Management System (BMS) to monitor and control the climate, resulting in significant energy savings.